Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5
Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate.
|
Observations: Name: MAIN BUILDING 01 - Component: 01 - Tag: 0161
Based on observation and interview, it was determined the facility failed to maintain the building construction requirements for the entire building.
Findings include:
1. Observation on March 17, 2025, at 8:45 a.m., revealed the building is a two-story, Type III (200), unprotected ordinary structure, with a basement and attic, that is fully sprinklered. This type of construction is not permitted to be greater than one story in height.
Interview with the Owner of the facility, Facility Administrator and Maintenance Director on March 17, 2025, at 1:00 p.m., confirmed the building construction type did not meet the requirements for an existing health care building.
| | Plan of Correction - To be completed: 04/15/2025
I. New owner will have an architect review the blueprint and construction plan of the building in order to determine a solution to correct the deficiency for building construction.
II. After architectural review, the facility will be able to determine a date for correction of deficiency.
III. Director of Maintenance/Designee will monitor progress of correcting the deficiency for building construction.
IV. Progress will be reported to the Quality Assurance Committee monthly for tracking and trending purposes.
V. Facility will be submitting a request for a one time waiver.
|
|