Pennsylvania Department of Health
LUTHERAN HOME AT HOLLIDAYSBURG, THE
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
LUTHERAN HOME AT HOLLIDAYSBURG, THE
Inspection Results For:

There are  36 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
LUTHERAN HOME AT HOLLIDAYSBURG, THE - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: - Component: -- - Tag: 0000



Based on an Emergency Preparedness Survey completed on September 17, 2024, it was determined that The Lutheran Home at Hollidaysburg had deficiencies that have the potential for minimal harm as related to the requirements of 42 CFR 483.73.





 Plan of Correction:


403.748(d)(2), 416.54(d)(2), 418.113(d)(2), 441.184(d)(2), 482.15(d)(2), 483.475(d)(2), 483.73(d)(2), 484.102(d)(2), 485.542(d)(2), 485.625(d)(2), 485.68(d)(2), 485.727(d)(2), 485.920(d)(2), 486.360(d)(2), 491.12(d)(2), 494.62(d)(2) STANDARD EP Testing Requirements:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
§416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2).

*[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, "Organizations" under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]:

(2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following:

(i) Participate in a full-scale exercise that is community-based every 2 years; or
(A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or
(B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event.
(ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed.

*[For Hospices at 418.113(d):]
(2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following:
(i) Participate in a full-scale exercise that is community based every 2 years; or
(A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.

(3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed.


*[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):]
(2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed.

*[For PACE at §460.84(d):]
(2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed.

*[For LTC Facilities at §483.73(d):]
(2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise.
(B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed.

*[For ICF/IIDs at §483.475(d)]:
(2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or.
(B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed.

*[For HHAs at §484.102]
(d)(2) Testing. The HHA must conduct exercises to test the emergency plan at
least annually. The HHA must do the following:
(i) Participate in a full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or.
(B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed.

*[For OPOs at §486.360]
(d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following:
(i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event.
(ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI's and OPO's] emergency plan, as needed.

*[ RNCHIs at §403.748]:
(d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following:
(i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed.
Observations:
Name: - Component: -- - Tag: 0039


Based on a review of the facility's Emergency Preparedness (EP) Plan, it was determined the facility failed to meet the Emergency Preparedness Testing/Testing Requirements of the emergency plan.

Findings include:

1. Interview and documentation review of the facility EP plan on September 17, 2024, at 1:00 p.m., revealed the facility failed to meet the annual requirements of section (i) full-scale exercise community-based or an Individual facility-based exercise.

Interview with the Facility Administrator and the Maintenance Director on September 17, 2024, at 1:30 p.m., confirmed the listed EP plan training/testing deficiency.





 Plan of Correction - To be completed: 11/02/2024


All staff will be Educated regarding the Emergency Preparedness Plan and training requirements.
The missed annual trainings will be completed by 11/2/2024.


Results will be reviewed/ reported to Quality Assurance Performance Improvement Semi-Annually to determine trends, compliance.

Quality Committee will determine need of continuance of audits.

Initial comments:Name: NEW BUILDING - Component: 02 - Tag: 0000


Facility ID# 010502
Component 02
Main Building

Based on a Medicare/Medicaid Recertification Survey completed on September 17, 2024, it was determined that The Lutheran Home at Hollidaysburg was not in compliance with the following requirements of the Life Safety Code for an existing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.90(a).

This is a two-story, Type II (111), protected non-combustible building, without a basement, that is fully sprinklered.




 Plan of Correction:


NFPA 101 STANDARD Means of Egress - General:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Means of Egress - General
Aisles, passageways, corridors, exit discharges, exit locations, and accesses are in accordance with Chapter 7, and the means of egress is continuously maintained free of all obstructions to full use in case of emergency, unless modified by 18/19.2.2 through 18/19.2.11.
18.2.1, 19.2.1, 7.1.10.1
Observations:
Name: NEW BUILDING - Component: 02 - Tag: 0211

Based on observation and interview, it was determined that the facility failed to maintain an unobstructed means of egress in one instance, affecting one of four smoke compartments.

Findings include:

1. Observation on September 17, 2024, at 11:09 a.m., revealed the clean linen room located on the second floor was overcrowded with miscellaneous storage impeding the exit egress route from the room.

Interview with the Facility Administrator and the Maintenance Director on September 17, 2024, at 1:30 p.m., confirmed the listed means of egress deficiency.






 Plan of Correction - To be completed: 11/02/2024

Items obstructing Means of Egress were immediately removed. Area will be monitored by the Environmental Services Manager or Designee to ensure compliance during daily rounds. Environmental staff were Immediately Educated regarding the area being free of obstruction.
The second floor clean linen room will be monitored by the Environmental Services Manager and or Designee to ensure compliance during daily rounds. Staff education provided regarding storage items in clean linen rooms. Results will be reviewed/ reported to Quality Assurance Performance Improvement Semi-Annually to determine trends, compliance.
Quality Committee will determine the need for continuance of audits.

NFPA 101 STANDARD Hazardous Areas - Enclosure:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9

Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322)
Observations:
Name: NEW BUILDING - Component: 02 - Tag: 0321

Based on observation and interview, it was determined the facility failed to maintain hazardous area enclosures in one instance, affecting one of four smoke compartments.

Findings include:

1. Observation on September 17, 2024, at 10:15 a.m., revealed the facility failed to maintain the required one-hour fire rating in room 106 by not equipping the door with a self-closing device. The room is greater than fifty square feet in size and is being used to house combustible storage.

Interview with the Facility Administrator and the Maintenance Director on September 17, 2024, at 1:30 p.m., confirmed the listed hazardous are enclosure deficiency.





 Plan of Correction - To be completed: 11/02/2024

During the Life Safety inspection room 106 was identified of not having an enclosure installed on door. And that there were more than fifty square feet of combustibles. To ensure compliance, all combustibles has been removed immediately.
. Area will be monitored by the Environmental Services Manager or Designee to ensure compliance during daily rounds. Environmental staff were Immediately Educated regarding the area being free of obstruction and combustibles. All staff will be Educated regarding
. Results will be reviewed/ reported to Quality Assurance Performance Improvement Semi-Annually to determine trends, compliance.
Quality Committee will determine need of continuance of audits.

NFPA 101 STANDARD Sprinkler System - Maintenance and Testing:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25
Observations:
Name: NEW BUILDING - Component: 02 - Tag: 0353

Based on observation and interview, it was determined the facility failed to maintain the automatic sprinkler system in one instance, affecting one of four smoke compartments.

Findings include:

1. Observation above the ceiling at the smoke barrier doors by resident room 218 on September 17, 2024, at 11:02 a.m., revealed an MC cable lying on top of the sprinkler pipe.

Interview with the Facility Administrator and the Maintenance Director on September 17, 2024, at 1:30 p.m., confirmed the listed automatic sprinkler system deficiency.





 Plan of Correction - To be completed: 11/02/2024

The area identified above the ceiling at the smoke barrier doors by room 218 were immediately addressed by Environmental Services staff. Preventative maintenance logs were established to reflect random visual monitoring of areas in sprinkler heads during weekly rounds. Environmental staff were Immediately Educated regarding Sprinklers, piping and mounting devices. Environmental Services staff will continue to monitor the area regarding sprinklers and components in the Health Center for Compliance during Preventative Maintenance Rounds. All staff will be Educated regarding sprinklers maintenance and Testing. Residents and Family Councils will also be provided with Education and upon admission to new residents.
. Results will be reviewed/ reported to Quality Assurance Performance Improvement Semi-Annually to determine trends, compliance.
Quality Committee will determine need of continuance of audits.

NFPA 101 STANDARD Electrical Equipment - Power Cords and Extens:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Electrical Equipment - Power Cords and Extension Cords
Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4.
10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5
Observations:
Name: NEW BUILDING - Component: 02 - Tag: 0920

Based on observation and interview, it was determined the facility failed to maintain electrical wiring systems and equipment in one instance, affecting one of four smoke compartments.

Findings include:

1. Observation on September 17, 2024, at 10:57 a.m., revealed there was a refrigerator plugged into a power strip in the pastoral care office

Interview with the Facility Administrator and the Maintenance Director on September 17, 2024, at 1:30 p.m., confirmed the listed electrical wiring systems deficiency.





 Plan of Correction - To be completed: 11/02/2024

The area identified, Pastor's Office. The refrigerator was disconnected immediately from the power strip. All staff areas and residents rooms had a visual inspection by the Environmental Service Staff. Areas will be monitored during weekly rounds by Environmental Staff Members. All staff will be Educated regarding surge protectors and proper use. Residents and Family Councils will also be provided with Education and upon admission to new residents.
. Results will be reviewed/ reported to Quality Assurance Performance Improvement Semi-Annually to determine trends, compliance.
Quality Committee will determine need of continuance of audits.


Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port