Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID# 750301
Component 01
Main Hospital Building

Based on an Occupancy Survey completed on May 2, 2019, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.

This occupancy survey was conducted for alterations to rework support spaces adjacent to the OR suite on the seventh floor and providing new scrub sinks to replace the existing sinks. This phase 1 inspection was for the new connecting corridor 7316, break room 7342, and soiled utility room 7346. Refer to drawing index numbers: H-18-1178 and H-19-0020.

This is an eight-story, Type II (222), fire resistive building, with a basement, that is fully sprinklered.



Plan of Correction: