REGIONAL HOSPITAL OF SCRANTON Building Inspection Results For:
There are 43 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - BUILDING 04 Component - 04
Facility ID#650901 Component 04 Tower and Ancillary Building
Based on a revisit to a Relicensure Survey completed July 24-25, 2023, it was determined that Regional Hospital of Scranton was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy.
This is a nine story, Type II (222), fire resistive building, with a basement, that is partially sprinklered.
Plan of Correction:
Initial Comments: Name - MOSES TAYLOR OLD BUILDING Component - 50
Facility ID#650901 Component 50 Building 01/OldMain
Based on a revisit to a Relicensure Survey completed July 24-25, 2023, it was determined that Regional Hospital of Scranton was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy.
This is a four story, Type II (222), fire resistive building, that is partially sprinklered.
Plan of Correction:
Initial Comments: Name - MOSES TAYLOR (1979 AND 1993 BUILDINGS) Component - 51
Facility ID#650901 Component 51 1979/1993 Building
Based on a Relicensure Survey completed July 24-25, 2023, it was determined that Regional Hospital of Scranton was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy.
This is a six story, Type II (222), fire resistive building, with a basement, and sub-basement, that is partially sprinklered.
Plan of Correction:
| |